Maintenance
Home » Support » Maintenance

Preventive Maintenance — The Cheapest Insurance You'll Ever Buy

A well-maintained SZGH CNC machine runs 15+ years. A neglected one breaks at the worst moment. This page gives you the schedule and procedures to keep your investment running.
 
  15+ years Typical equipment lifespan with proper maintenance
 <2 hours/week Total preventive maintenance time per machine
  5–10× ROI of preventive vs. reactive repairs
Maintenance Schedule Overview

Your SZGH Maintenance Calendar at a Glance

Frequency

CNC Machines

Robot Arms

Daily (5–10 min)

Power on and run no-load warm-up; check spindle/axis/lubrication status on controller; inspect way covers and telescopic shields; check/top up coolant; remove chips and wipe down panel; confirm air pressure (0.6–0.8 MPa).

Visual check; cable inspection.

Weekly (~30 min)

Top up way oil to MAX line and verify distribution to all axes; clean coolant tank surface and remove floating chips; inspect chip conveyor and cable carriers; verify E-stop buttons; lubricate manual points per spec sheet.

Joint torque check; gripper inspection.

Monthly (1–2 hrs)

Check spindle bearing temperature (≤60°C normal); replace way oil filter if pressure drop exceeds spec; clean coolant tank thoroughly and check pH (8–9); inspect ballscrew backlash; check spindle drawbar pressure; run accuracy test cuts; update controller backup files.

Cable wear check; calibration verification.

Quarterly (2–4 hrs)

Drain and replace way oil and coolant entirely; clean tank, pump, and lines; inspect spindle belt tension; check air filter on hydraulic pump; inspect axis motors and encoders; verify alarm logging system.

Reducer grease top-up; full motion test.

Annually (1 day, with engineer)

Comprehensive spindle bearing inspection (preload, runout); ballscrew preload check and replacement if needed; linear guide rail inspection and lubrication overhaul; full geometric accuracy verification (laser interferometer); controller firmware update; electrical cabinet inspection; replace worn-out items per inspection report.

Reducer grease change; controller backup; full calibration.

Annual service is best done by SZGH trained technicians. We recommend booking through our service portal.
Critical Don'ts

Common Maintenance Mistakes to Avoid

Don't mix lubricants

Always use the manufacturer-specified oil grade

Don't clean way oil systems with solvents

Damages seals

Don't wash robot with high-pressure water

Damages cable seals

Don't delay coolant changes

Bacterial growth degrades cutting performance and damages skin

Don't modify safety circuits

Voids warranty and creates injury risk
 

Don't run a machine that shows new alarms without diagnosis

Don't use compressed air to "blow chips" out of ballscrew area

Forces chips into precision components
Spare Parts Stock Recommendations

What to Keep on Your Shelf

For 24/7 operation, we recommend keeping these on-hand:
 

Item

CNC Lathe

CNC Milling

Robot Arm

Spindle belt

1 spare

1 spare

Way oil filter

2 spare

2 spare

Coolant filter

2 spare

2 spare

Tool holder seals

1 set

1 set

Reducer grease (per spec)

1 cartridge

Cable assembly (dress pack)

1 set after Year 3

Welding torch consumables

1 month supply

Maintenance Service Plans

Let SZGH Handle It

If you'd rather not manage maintenance in-house, we offer:

Remote Diagnostic

24/7 remote support, alarm log review, monthly health report
 
Single-machine customers

Annual Service

All of above + 1 annual on-site comprehensive service
 
Multi-machine shops

Full Maintenance Contract

All preventive maintenance handled by SZGHTECH engineers
 
Production facilities, integrated lines
FAQ

Frequently Asked Questions

Quickly find the answers you care about
  • Q Can I do annual maintenance myself?

    A
    Some tasks (oil changes, filter replacements) can be done in-house. Geometric accuracy verification and bearing inspection require specialized tools (laser interferometer, micrometers) and training — we recommend SZGH technicians for annual service.

  • Q How long does the spindle on a SZGH CNC lathe last?

    A
    With proper maintenance, SZGH CNC lathe spindles typically last 10–15 years before requiring bearing replacement. Daily warm-up and consistent lubrication are the biggest factors in spindle longevity.

  • Q My robot reducer feels warm — is that normal?

    A
    Yes. Robot reducers (gear units) typically run 40–60°C during continuous operation. Above 70°C indicates over-grease, under-grease, or excessive load. Stop operation and contact support if temperature exceeds 70°C.

  • Q How often should I change the way oil on my CNC lathe?

    A
    Way oil should be topped up weekly and fully changed every 3 months (quarterly) for typical 8-hour shifts. For 16+ hour operation, change every 2 months. Always use the manufacturer-specified lubricant grade.

Need Maintenance Help?

Get a free quote and engineering consultation within 24 hours.

SZGH — Manufacturing Automation Upgrade Expert for SMEs

We help small and medium manufacturers compete with less labor, lower cost, and smarter machines — through CNC system and CNC machinery and industrial robots total solution built for real factory floors, not just showrooms.
Trusted by 3,000+ factories across 126 countries.

QUICK LINKS

CNC Machine

Robot Arm

Contact Us

Tel: +86-18925223781
Email:  export02@szghtech.com
WhatsApp+86-18925223781
Add: South Digital Innovation Industrial Base, Longgang District, Shenzhen, Guangdong , China
Subscribe to our newsletter
Promotions, new products and sales. Directly to your inbox.
Copyright © 2026 Shenzhen Guanhong Technology Co., Ltd. All Rights Reserved.| Sitemap | Privacy Policy